Operation from the overhead conductor rails at Shaw's Cove Railroad Bridge in Connecticut In the movable bridge that uses a rigid overhead rail, there is a really need to transition from the catenary wire system into an overhead conductor rail on the bridge portal (the last traction present pylon ahead of the movable bridge). As an example, the abi